Jesse Hartley Way, Liverpool Docks
Park Central is the second phase of the Central Docks residential developments, consisting of 129 one and two bed apartments, two retail unites and a gym.
We completed the water connection within budget and time scale.
Total savings savings to this job was a sum of £166,137.00.